BLOCK : 2
ITI Trade Fitter, Machinist, Turner Important Question with Answer
ट्रेड थ्योरी आईटीआई क्वेश्चन पेपर
C. The effective diameter of thread D. The rod diameter of thread
131.A screw thread is designated as 1" B.S.P. thread, in I inch B.S P. thread what l" indicates?
A. Major diameter of thread B. Minor diameter of thread
C. Pitch diameter of thread D. Hole diameter of Pipe
132.In a sine bar the standard length is measured from.......
A. Edge to edge B. Between inner circumference of two buttons
C. Between out circumference of two buttons D. Between the centers of two buttons
133.Work is usually required to be held in a vertical position for layout. For this purpose, lit is
clamped to-
A. Surface plate B. A machine bed
C. An angle plate D. A V block
134. पाने का पानी घरो तक पहुँचाने के लिए प्रयोग किया जाता है The water obtained is used to transport the house
A. Galvanized Iron Pipe B. Lad Pipe
C. Kaper pipe D. cast iron pipes Asn. A
135. टूटी को पूरा बन्द करने के बाद भी पानी फिर भी निकलता हैं Even after the complete shut down of the broken water, water still goes out
A. Washers Damaged B. Spindle Turning
C. Not being straightforward D. None of these Asn. A.
136. 'ए' ग्रेड वी ब्लाकों का प्रयोग निम्न में से किस कार्य के लिए किया जाता 'A' grade V blocks are used for which of the following.
131.A screw thread is designated as 1" B.S.P. thread, in I inch B.S P. thread what l" indicates?
A. Major diameter of thread B. Minor diameter of thread
C. Pitch diameter of thread D. Hole diameter of Pipe
132.In a sine bar the standard length is measured from.......
A. Edge to edge B. Between inner circumference of two buttons
C. Between out circumference of two buttons D. Between the centers of two buttons
133.Work is usually required to be held in a vertical position for layout. For this purpose, lit is
clamped to-
A. Surface plate B. A machine bed
C. An angle plate D. A V block
134. पाने का पानी घरो तक पहुँचाने के लिए प्रयोग किया जाता है The water obtained is used to transport the house
A. Galvanized Iron Pipe B. Lad Pipe
C. Kaper pipe D. cast iron pipes Asn. A
135. टूटी को पूरा बन्द करने के बाद भी पानी फिर भी निकलता हैं Even after the complete shut down of the broken water, water still goes out
A. Washers Damaged B. Spindle Turning
C. Not being straightforward D. None of these Asn. A.
136. 'ए' ग्रेड वी ब्लाकों का प्रयोग निम्न में से किस कार्य के लिए किया जाता 'A' grade V blocks are used for which of the following.